About your Search

20120925
20121003
STATION
SFGTV 2
LANGUAGE
Search Results 0 to 1 of about 2 (some duplicates have been removed)
can see, maybe he can point that out. thank you very much. >> thank you. my name is ryan heart ludky. i'd like to answer one question that was asked about the other project. when we looked at the other project which was 2881 which was last year we reviewed the calculations and found -- ill say errors in the calculations or mistakes for design of the shoring. we talked to the design engineer and he modified the design to provide the proper strength for shoring of the excavation. that was part of my objective, and the service that i provide to keith on this job. when we got the project in mid-august, we met with the contractor. once he heard that he had the permit we asked for the drawings, we asked for the calculations. respect dbi and dbi and the people that do the plan checking. i got a copy of the calculations and a copy of the shoring plans. you could not connect them. and i been in this profession for a very long time, almost 40 years. so that was number one. we couldn't make a connection with a bunch of computer -- but you couldn't tie the computer output to the plans. also, we
Search Results 0 to 1 of about 2 (some duplicates have been removed)